{"id":603,"date":"2020-08-10T08:11:58","date_gmt":"2020-08-10T12:11:58","guid":{"rendered":"http:\/\/site.alliedbolt.com\/blog\/?p=603"},"modified":"2020-08-10T08:11:58","modified_gmt":"2020-08-10T12:11:58","slug":"boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike","status":"publish","type":"post","link":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/","title":{"rendered":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike"},"content":{"rendered":"<p><em><small>Reprinted from <a href=\"https:\/\/realestate.boston.com\/new-developments\/2020\/07\/16\/preliminary-construction-starts-development-over-mass-pike\/\" rel=\"noopener noreferrer\" target=\"_blank\">Boston.com<\/a><\/small><\/em><\/p>\n<p>Preliminary construction started this week on a two-tower development that would be the first project over the Massachusetts Turnpike in Boston in a generation.<\/p>\n<p>Developer\u00a0<a href=\"https:\/\/www.samuelsre.com\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/urldefense.com\/v3\/__https:\/\/www.samuelsre.com__;!!BspMT6SJLSDJ!cXYBQhFcxKr3KoCwZofCuIpfpndZG2BJu50d--Ww1OUR2jooNcfwqgH8sZN-93LRQw$&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNFGH1SiDmOnYHWbbkDqfti4I9Xs7Q\">Samuels &amp; Associates<\/a> plans to construct a 15-story, 435,000-square-foot office building and a 13-story, 150,000-square-foot hotel, along with 50,000 square feet of retail, on a deck over where the Mass. Pike intersects with Boylston Street and Massachusetts Avenue in Back Bay.<\/p>\n<p>When finished, 1001 Boylston St. will be the largest development over the turnpike since Copley Place opened in early 1984. Numerous such attempts between then and now have collapsed due to financing and engineering challenges. Speculation surrounding this particular site \u2014 dubbed Parcel 12 \u2014 <a href=\"http:\/\/realestate.boston.com\/news\/2018\/11\/29\/proposed-back-bay-development-parcel-12\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=http:\/\/realestate.boston.com\/news\/2018\/11\/29\/proposed-back-bay-development-parcel-12\/&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNEl1L80e7xvzzWun8pIi_zUUHgeEQ\">dates to at least the early 2000s<\/a>.<\/p>\n<p>It hasn\u2019t exactly been a smooth ride for Samuels &amp; Associates either. The developer and a partner\u00a0<a href=\"https:\/\/www.bizjournals.com\/boston\/real_estate\/2013\/03\/samuels-weiner-win-air-rights-project.html\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/urldefense.com\/v3\/__https:\/\/www.bizjournals.com\/boston\/real_estate\/2013\/03\/samuels-weiner-win-air-rights-project.html__;!!BspMT6SJLSDJ!cXYBQhFcxKr3KoCwZofCuIpfpndZG2BJu50d--Ww1OUR2jooNcfwqgH8sZOjs182MA$&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNGcWiJZj5BMBLg5FjThKf31zXUXXg\">won the air rights for the project<\/a>\u00a0from the Massachusetts Department of Transportation in 2013. Samuels &amp; Associates has been working toward construction since, and\u00a0<a href=\"http:\/\/realestate.boston.com\/news\/2018\/11\/29\/proposed-back-bay-development-parcel-12\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=http:\/\/realestate.boston.com\/news\/2018\/11\/29\/proposed-back-bay-development-parcel-12\/&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNEl1L80e7xvzzWun8pIi_zUUHgeEQ\">first broached its current plans in city filings in 2018<\/a>. It\u00a0<a href=\"https:\/\/www.bostonglobe.com\/2020\/07\/10\/business\/its-been-40-years-since-someones-built-over-mass-pike-until-now\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.bostonglobe.com\/2020\/07\/10\/business\/its-been-40-years-since-someones-built-over-mass-pike-until-now\/&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNGcRaLQbC4i9IT5DWHS8vpAU2AZBg\">announced last week<\/a>\u00a0that it had secured $700 million in financing, enabling that construction work to start. It\u2019s scheduled to wrap in 2023.<\/p>\n<p>The construction, especially of the deck, will mean lane closures along the turnpike, and Samuels &amp; Associates hopes to be out with a traffic plan within the next few weeks,\u00a0<a href=\"https:\/\/www.bostonglobe.com\/2020\/07\/10\/business\/its-been-40-years-since-someones-built-over-mass-pike-until-now\/?event=event25\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.bostonglobe.com\/2020\/07\/10\/business\/its-been-40-years-since-someones-built-over-mass-pike-until-now\/?event%3Devent25&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNGh4YHqjVCLZw8pZhUx1TdEFgaucA\">according to The Boston Globe<\/a><i>.<\/i><\/p>\n<p>When it\u2019s finished, the project will bring major streetscape changes such as wider sidewalks, fresh bike lanes, a relocation of the turnpike\u2019s westbound onramp from Mass. Ave. to Newbury Street, a new entrance for the Hynes Green Line stop, a renovated pedestrian tunnel to Hynes Convention Center from that stop, and a half-acre publicly accessible plaza. Samuels &amp; Associates \u2014 one of the city\u2019s more prolific developers of late, <a href=\"https:\/\/www.bostonmagazine.com\/property\/2014\/11\/25\/steven-samuels-real-estate-fenway-boston\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/urldefense.com\/v3\/__https:\/\/www.bostonmagazine.com\/property\/2014\/11\/25\/steven-samuels-real-estate-fenway-boston\/__;!!BspMT6SJLSDJ!cXYBQhFcxKr3KoCwZofCuIpfpndZG2BJu50d--Ww1OUR2jooNcfwqgH8sZO-KKSqjQ$&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNGcGhhnCbs7u6uzC0TT1iobabDGTA\">especially in Fenway <\/a>\u2014 is touting that expanse in particular.<\/p>\n<p>\u201cNot only will it repair the scar created when the Mass. Pike was constructed, it will establish the largest new public open space in the area in many decades,\u201d Steve Samuels, Samuels &amp; Associates chairman, said in a statement.<\/p>\n<p>Online automotive platform CarGurus <a href=\"https:\/\/investors.cargurus.com\/news-releases\/news-release-details\/cargurus-signs-lease-anchor-tenant-1001-boylston-street-boston\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/urldefense.com\/v3\/__https:\/\/investors.cargurus.com\/news-releases\/news-release-details\/cargurus-signs-lease-anchor-tenant-1001-boylston-street-boston__;!!BspMT6SJLSDJ!cXYBQhFcxKr3KoCwZofCuIpfpndZG2BJu50d--Ww1OUR2jooNcfwqgH8sZOsNtjUCQ$&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNFTYVTyvSNBOLHeSpDNKpK6uFf0xw\">agreed in December to<\/a>\u00a0an approximately 275,000-square-foot, 15-year lease to anchor the office portion of the project. It will be consolidating its headquarters from three locations in Cambridge, where the company was founded in 2006.<\/p>\n<p>An outpost of the Amsterdam-based citizenM hotel brand will use the other tower. It will be the second citizenM in Boston \u2014 and one of the few in the United States \u2014 after a 272-room one that opened late last year in the Hub on Causeway development over and around TD Garden. The new hotel will have 390 rooms.<\/p>\n<p>Another project involving decking over the turnpike \u2014 the five-building Fenway Center along the highway from Beacon Street to Brookline Avenue \u2014 is also due to wrap during the first half of this decade. Meredith Management and IQHQ, which focuses on developing life sciences properties, plans to finish work on the Kenmore Square project in 2024. Like with 1001 Boylston, Fenway Center <a href=\"https:\/\/www.bostonglobe.com\/2020\/03\/13\/business\/long-planned-fenway-center-project-above-mass-pike-could-happen-this-summer\/\" target=\"_blank\" rel=\"noopener noreferrer\" data-saferedirecturl=\"https:\/\/www.google.com\/url?q=https:\/\/www.bostonglobe.com\/2020\/03\/13\/business\/long-planned-fenway-center-project-above-mass-pike-could-happen-this-summer\/&amp;source=gmail&amp;ust=1594992948194000&amp;usg=AFQjCNGHqa34cYLZ5vUCtexaRx720SscRQ\">has been many challenge-filled years in the making<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<hr \/>\n<p>Allied Bolt and Screw Corporation, a Small Business incorporated in the Commonwealth of Massachusetts by Richard \u2018Dick\u2019 Goldberg, has been building strong relationships since 1961 with an expansive quality inventory, exceptional service and highly valued customer appreciation. Allied carries thousands of products. <a href=\"http:\/\/www.alliedbolt.com\/contact.html\" target=\"_blank\" rel=\"noopener noreferrer\">Contact Us<\/a> for more information.<\/p>\n<hr \/>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bay Village\u2019s 132 Arlington Street has traded for $9.25 million to a well-known Boston developer\u2014but it\u2019s going to stay a parking lot for a bit longer.<\/p>\n","protected":false},"author":1,"featured_media":605,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ocean_post_layout":"","ocean_both_sidebars_style":"","ocean_both_sidebars_content_width":0,"ocean_both_sidebars_sidebars_width":0,"ocean_sidebar":"","ocean_second_sidebar":"","ocean_disable_margins":"enable","ocean_add_body_class":"","ocean_shortcode_before_top_bar":"","ocean_shortcode_after_top_bar":"","ocean_shortcode_before_header":"","ocean_shortcode_after_header":"","ocean_has_shortcode":"","ocean_shortcode_after_title":"","ocean_shortcode_before_footer_widgets":"","ocean_shortcode_after_footer_widgets":"","ocean_shortcode_before_footer_bottom":"","ocean_shortcode_after_footer_bottom":"","ocean_display_top_bar":"default","ocean_display_header":"default","ocean_header_style":"","ocean_center_header_left_menu":"","ocean_custom_header_template":"","ocean_custom_logo":0,"ocean_custom_retina_logo":0,"ocean_custom_logo_max_width":0,"ocean_custom_logo_tablet_max_width":0,"ocean_custom_logo_mobile_max_width":0,"ocean_custom_logo_max_height":0,"ocean_custom_logo_tablet_max_height":0,"ocean_custom_logo_mobile_max_height":0,"ocean_header_custom_menu":"","ocean_menu_typo_font_family":"","ocean_menu_typo_font_subset":"","ocean_menu_typo_font_size":0,"ocean_menu_typo_font_size_tablet":0,"ocean_menu_typo_font_size_mobile":0,"ocean_menu_typo_font_size_unit":"px","ocean_menu_typo_font_weight":"","ocean_menu_typo_font_weight_tablet":"","ocean_menu_typo_font_weight_mobile":"","ocean_menu_typo_transform":"","ocean_menu_typo_transform_tablet":"","ocean_menu_typo_transform_mobile":"","ocean_menu_typo_line_height":0,"ocean_menu_typo_line_height_tablet":0,"ocean_menu_typo_line_height_mobile":0,"ocean_menu_typo_line_height_unit":"","ocean_menu_typo_spacing":0,"ocean_menu_typo_spacing_tablet":0,"ocean_menu_typo_spacing_mobile":0,"ocean_menu_typo_spacing_unit":"","ocean_menu_link_color":"","ocean_menu_link_color_hover":"","ocean_menu_link_color_active":"","ocean_menu_link_background":"","ocean_menu_link_hover_background":"","ocean_menu_link_active_background":"","ocean_menu_social_links_bg":"","ocean_menu_social_hover_links_bg":"","ocean_menu_social_links_color":"","ocean_menu_social_hover_links_color":"","ocean_disable_title":"default","ocean_disable_heading":"default","ocean_post_title":"","ocean_post_subheading":"","ocean_post_title_style":"","ocean_post_title_background_color":"","ocean_post_title_background":0,"ocean_post_title_bg_image_position":"","ocean_post_title_bg_image_attachment":"","ocean_post_title_bg_image_repeat":"","ocean_post_title_bg_image_size":"","ocean_post_title_height":0,"ocean_post_title_bg_overlay":0.5,"ocean_post_title_bg_overlay_color":"","ocean_disable_breadcrumbs":"default","ocean_breadcrumbs_color":"","ocean_breadcrumbs_separator_color":"","ocean_breadcrumbs_links_color":"","ocean_breadcrumbs_links_hover_color":"","ocean_display_footer_widgets":"default","ocean_display_footer_bottom":"default","ocean_custom_footer_template":"","ocean_post_oembed":"","ocean_post_self_hosted_media":"","ocean_post_video_embed":"","ocean_link_format":"","ocean_link_format_target":"self","ocean_quote_format":"","ocean_quote_format_link":"post","ocean_gallery_link_images":"on","ocean_gallery_id":[],"footnotes":""},"categories":[239],"tags":[26,6,7,22,140,4,56,57,64,317,24,50,61,12,20,18,19,21,100,63,42,5,13,16,14,15,17,43,47,101,53,27,23,10,3,58,65,70,67,69,66,68,44,46,8,49,48,55,238,232,233,236,9,51,45,40,11,52,315],"class_list":["post-603","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-boston-construction-news","tag-allied-bolt-and-screw-corp","tag-anchor-bolts","tag-bolts","tag-boston-bolt-and-screws","tag-boston-construction-news","tag-boston-construction-supplies","tag-brass","tag-bronze","tag-carriage-bolts","tag-carriage-bolts-gr-8-zinc-yellow","tag-chicago-bolt-screw","tag-deck-screws","tag-f1554-grade-55-threaded-rod","tag-f1554-plain-steel-bolts","tag-f1554-plain-steel-nuts","tag-f1554-plain-steel-rods","tag-f1554-plain-steel-studs","tag-f1554-plain-steel-washers","tag-hard-hats","tag-heavy-duty-hollow-wall-anchors","tag-hex-bolts","tag-hot-galvanized-anchor-bolts","tag-hot-galvanized-bolts","tag-hot-galvanized-nuts","tag-hot-galvanized-rods","tag-hot-galvanized-studs","tag-hot-galvanized-washers","tag-lag-bolts","tag-machine-screws","tag-masks","tag-masonry-anchors","tag-neil-goldberg","tag-new-york-construction-supply","tag-nuts","tag-nuts-bolts","tag-nylon","tag-nylon-bolts","tag-nylon-hinged-screw-covers","tag-nylon-nuts","tag-nylon-screw-coversaluminum","tag-nylon-screws","tag-nylon-washers","tag-plow-bolts","tag-rivets","tag-rods","tag-self-drilling-screws","tag-sheet-metal-screws","tag-stainless","tag-stainless-steel-anchors","tag-stainless-steel-bolts","tag-stainless-steel-screws","tag-stainless-steel-threaded-rods","tag-studs","tag-tamperproof-screws","tag-threaded-inserts","tag-threaded-rods","tag-washers","tag-wood-screws","tag-zrc-cold-galvanize","entry","has-media"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike - Allied Bolt<\/title>\n<meta name=\"description\" content=\"Read our post entitled: Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike - Allied Bolt\" \/>\n<meta property=\"og:description\" content=\"Read our post entitled: Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike\" \/>\n<meta property=\"og:url\" content=\"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/\" \/>\n<meta property=\"og:site_name\" content=\"Allied Bolt\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/alliedbolt\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-10T12:11:58+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2020\/08\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"768\" \/>\n\t<meta property=\"og:image:height\" content=\"432\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Allied Bolt &amp; Screw\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Allied Bolt &amp; Screw\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#article\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/\"},\"author\":{\"name\":\"Allied Bolt &amp; Screw\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#\\\/schema\\\/person\\\/a02148b1611963d35af18b56bf13b3f1\"},\"headline\":\"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike\",\"datePublished\":\"2020-08-10T12:11:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/\"},\"wordCount\":568,\"publisher\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg\",\"keywords\":[\"Allied Bolt and Screw Corp\",\"Anchor Bolts\",\"Bolts\",\"Boston Bolt and Screws\",\"Boston Construction News\",\"Boston Construction Supplies\",\"Brass\",\"Bronze\",\"Carriage Bolts\",\"CARRIAGE BOLTS GR 8 ZINC YELLOW\",\"Chicago Bolt &amp; Screw\",\"Deck Screws\",\"F1554 Grade 55 Threaded Rod\",\"F1554 Plain Steel Bolts\",\"F1554 Plain Steel Nuts\",\"F1554 Plain Steel Rods\",\"F1554 Plain Steel Studs\",\"F1554 Plain Steel Washers\",\"Hard Hats\",\"Heavy-Duty Hollow Wall Anchors\",\"Hex Bolts\",\"Hot Galvanized Anchor Bolts\",\"Hot Galvanized Bolts\",\"Hot Galvanized Nuts\",\"Hot Galvanized Rods\",\"Hot Galvanized Studs\",\"Hot Galvanized Washers\",\"Lag Bolts\",\"Machine Screws\",\"Masks\",\"Masonry Anchors\",\"Neil Goldberg\",\"New York Construction Supply\",\"Nuts\",\"Nuts &amp; Bolts\",\"Nylon\",\"Nylon Bolts\",\"Nylon Hinged Screw Covers\",\"Nylon Nuts\",\"Nylon Screw CoversAluminum\",\"Nylon Screws\",\"Nylon Washers\",\"Plow Bolts\",\"Rivets\",\"Rods\",\"Self-Drilling Screws\",\"Sheet Metal Screws\",\"Stainless\",\"Stainless Steel Anchors\",\"Stainless Steel Bolts\",\"Stainless Steel Screws\",\"Stainless Steel Threaded Rods\",\"Studs\",\"Tamperproof Screws\",\"Threaded Inserts\",\"Threaded Rods\",\"Washers\",\"Wood Screws\",\"ZRC COLD GALVANIZE\"],\"articleSection\":[\"Boston Construction News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/\",\"url\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/\",\"name\":\"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike - Allied Bolt\",\"isPartOf\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#primaryimage\"},\"image\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg\",\"datePublished\":\"2020-08-10T12:11:58+00:00\",\"description\":\"Read our post entitled: Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike\",\"breadcrumb\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#primaryimage\",\"url\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg\",\"contentUrl\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/wp-content\\\/uploads\\\/2020\\\/08\\\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg\",\"width\":768,\"height\":432,\"caption\":\"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike\"}]},{\"@type\":\"WebSite\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#website\",\"url\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/\",\"name\":\"Allied Bolt\",\"description\":\"\",\"publisher\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#organization\",\"name\":\"Allied Bolt\",\"url\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-allied-logo-1.jpg\",\"contentUrl\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/05\\\/cropped-allied-logo-1.jpg\",\"width\":453,\"height\":160,\"caption\":\"Allied Bolt\"},\"image\":{\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/alliedbolt\",\"https:\\\/\\\/www.linkedin.com\\\/in\\\/neil-goldberg-25329a43\\\/\"]},{\"@type\":\"Person\",\"@id\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/#\\\/schema\\\/person\\\/a02148b1611963d35af18b56bf13b3f1\",\"name\":\"Allied Bolt &amp; Screw\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3815f98f644e220915485bc743a6fa433a4589e2d41b02be15342f62c411a74c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3815f98f644e220915485bc743a6fa433a4589e2d41b02be15342f62c411a74c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/3815f98f644e220915485bc743a6fa433a4589e2d41b02be15342f62c411a74c?s=96&d=mm&r=g\",\"caption\":\"Allied Bolt &amp; Screw\"},\"url\":\"http:\\\/\\\/site.alliedbolt.com\\\/blog\\\/author\\\/administrator\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike - Allied Bolt","description":"Read our post entitled: Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/","og_locale":"en_US","og_type":"article","og_title":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike - Allied Bolt","og_description":"Read our post entitled: Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike","og_url":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/","og_site_name":"Allied Bolt","article_publisher":"https:\/\/www.facebook.com\/alliedbolt","article_published_time":"2020-08-10T12:11:58+00:00","og_image":[{"width":768,"height":432,"url":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2020\/08\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg","type":"image\/jpeg"}],"author":"Allied Bolt &amp; Screw","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Allied Bolt &amp; Screw","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#article","isPartOf":{"@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/"},"author":{"name":"Allied Bolt &amp; Screw","@id":"http:\/\/site.alliedbolt.com\/blog\/#\/schema\/person\/a02148b1611963d35af18b56bf13b3f1"},"headline":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike","datePublished":"2020-08-10T12:11:58+00:00","mainEntityOfPage":{"@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/"},"wordCount":568,"publisher":{"@id":"http:\/\/site.alliedbolt.com\/blog\/#organization"},"image":{"@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#primaryimage"},"thumbnailUrl":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2020\/08\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg","keywords":["Allied Bolt and Screw Corp","Anchor Bolts","Bolts","Boston Bolt and Screws","Boston Construction News","Boston Construction Supplies","Brass","Bronze","Carriage Bolts","CARRIAGE BOLTS GR 8 ZINC YELLOW","Chicago Bolt &amp; Screw","Deck Screws","F1554 Grade 55 Threaded Rod","F1554 Plain Steel Bolts","F1554 Plain Steel Nuts","F1554 Plain Steel Rods","F1554 Plain Steel Studs","F1554 Plain Steel Washers","Hard Hats","Heavy-Duty Hollow Wall Anchors","Hex Bolts","Hot Galvanized Anchor Bolts","Hot Galvanized Bolts","Hot Galvanized Nuts","Hot Galvanized Rods","Hot Galvanized Studs","Hot Galvanized Washers","Lag Bolts","Machine Screws","Masks","Masonry Anchors","Neil Goldberg","New York Construction Supply","Nuts","Nuts &amp; Bolts","Nylon","Nylon Bolts","Nylon Hinged Screw Covers","Nylon Nuts","Nylon Screw CoversAluminum","Nylon Screws","Nylon Washers","Plow Bolts","Rivets","Rods","Self-Drilling Screws","Sheet Metal Screws","Stainless","Stainless Steel Anchors","Stainless Steel Bolts","Stainless Steel Screws","Stainless Steel Threaded Rods","Studs","Tamperproof Screws","Threaded Inserts","Threaded Rods","Washers","Wood Screws","ZRC COLD GALVANIZE"],"articleSection":["Boston Construction News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/","url":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/","name":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike - Allied Bolt","isPartOf":{"@id":"http:\/\/site.alliedbolt.com\/blog\/#website"},"primaryImageOfPage":{"@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#primaryimage"},"image":{"@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#primaryimage"},"thumbnailUrl":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2020\/08\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg","datePublished":"2020-08-10T12:11:58+00:00","description":"Read our post entitled: Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike","breadcrumb":{"@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#primaryimage","url":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2020\/08\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg","contentUrl":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2020\/08\/Boston-Construction-News-Preliminary-construction-has-started-on-the-Boylston-Street-complex-over-the-Mass.-Pike.jpg","width":768,"height":432,"caption":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike"},{"@type":"BreadcrumbList","@id":"http:\/\/site.alliedbolt.com\/blog\/boston-construction-news-preliminary-construction-has-started-on-the-boylston-street-complex-over-the-mass-pike\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/site.alliedbolt.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Boston Construction News: Preliminary construction has started on the Boylston Street complex over the Mass. Pike"}]},{"@type":"WebSite","@id":"http:\/\/site.alliedbolt.com\/blog\/#website","url":"http:\/\/site.alliedbolt.com\/blog\/","name":"Allied Bolt","description":"","publisher":{"@id":"http:\/\/site.alliedbolt.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/site.alliedbolt.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"http:\/\/site.alliedbolt.com\/blog\/#organization","name":"Allied Bolt","url":"http:\/\/site.alliedbolt.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/site.alliedbolt.com\/blog\/#\/schema\/logo\/image\/","url":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2023\/05\/cropped-allied-logo-1.jpg","contentUrl":"http:\/\/site.alliedbolt.com\/blog\/wp-content\/uploads\/2023\/05\/cropped-allied-logo-1.jpg","width":453,"height":160,"caption":"Allied Bolt"},"image":{"@id":"http:\/\/site.alliedbolt.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/alliedbolt","https:\/\/www.linkedin.com\/in\/neil-goldberg-25329a43\/"]},{"@type":"Person","@id":"http:\/\/site.alliedbolt.com\/blog\/#\/schema\/person\/a02148b1611963d35af18b56bf13b3f1","name":"Allied Bolt &amp; Screw","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/3815f98f644e220915485bc743a6fa433a4589e2d41b02be15342f62c411a74c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/3815f98f644e220915485bc743a6fa433a4589e2d41b02be15342f62c411a74c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3815f98f644e220915485bc743a6fa433a4589e2d41b02be15342f62c411a74c?s=96&d=mm&r=g","caption":"Allied Bolt &amp; Screw"},"url":"http:\/\/site.alliedbolt.com\/blog\/author\/administrator\/"}]}},"_links":{"self":[{"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/posts\/603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/comments?post=603"}],"version-history":[{"count":1,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/posts\/603\/revisions"}],"predecessor-version":[{"id":604,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/posts\/603\/revisions\/604"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/media\/605"}],"wp:attachment":[{"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/media?parent=603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/categories?post=603"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/site.alliedbolt.com\/blog\/wp-json\/wp\/v2\/tags?post=603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}